Report

STAAR Testing Countdown

The clock is ticking…Countdown to STAAR!

April 9-Grades 3-8 RLA, English I, April 10-English II, April 16-Grades 5 &8 Science, Biology, April 17 Grade 8 Social Studies & US History, April 23-Grades 3-8 Math & Algebra I

Stadium Structural Observation Report

Alice High School Football Stadium Structural Observation Report 10-10-23

Click Here to Open Report.

inspection of Memorial Stadium

MEMORIAL STADIUM

According to an inspection of Alice ISD's Memorial Stadium by International Consulting Engineers, widespread deficiencies were found to affect the structure in just about every aspect. The 77-year-old structure is near the end of its service life. It is recommended by the ICE Engineers that the development of a master plan for the stadium facility replacement be initiated. Repairs can be performed to extend the life of the current structure, but considering the age of the stadium structure, more frequent repairs and excessive maintenance costs will be the norm and thus the replacement option is more cost-effective.

#ItStartswithME!

Important Links

Alice iSD Events

|
March 2024
SunMonTueWedThuFriSat

Important docs...

Name
Alice Calendar 23-24 (2)c.pdf
2024_2025 AHS Course Guide_19Mar24.pdf
Student Handbook 2023-2024 FINALIZED3.pdf
Alice High School Football Stadium Structural Observation Report 10-10-23.pdf
Drop off and pick up zones 01.23.2024.docx
Loading...

If contents fail to load, please reload page.